- Messages
- 272
- Country
I've been working on CYWG Winnipeg off and on for about two years now. It is time to show the FS9ers out there the progress I've made. Just a bit of background first. This project was started by Jon Gabbert (of CYVR fame) quite some time ago. In fact, I think he announced it on his "AddictedtoAirspace" website but that was so long ago that the new terminal building, opened in 2011, wasn't built built yet. After I finished CYQR Regina Jon asked if I'd like to partner with him on his Winnipeg project. Jon had got a good start on the terrain work and had built up a nice model of the new terminal and the Perimeter Aviation hangar. Jon's real world career as a commercial pilot with Air Canada got in the way of scenery design so he offered to turn over the keys to me. By this time I had already invested too much time and effort into the project to say no. I had already built up models of most of the airport buildings on the west side of the field. There was no turning back so I've carried-on to the point were I've just finished rebuilding Jon's Terminal building to achieve a much higher resolution of detail. My project philosophy is to get as much resolution out of FS9. I've also finished models for most of the Terminal campus (hotels, Greyhound Bus terminal, old Control Tower etc.) So, I think there is enough progress to show off the project. Please keep in mind that the screen shots show only the building models. Still lots of work after all the building are done to put in vegetation, fencing, lamp posts, power poles and ramp clutter. I start with a series of shots of the terminal building. Note these are all WIP shots. The terminal building still needs all the baggage facility doors added.
Greg
Greg