jtanabodee
Resource contributor
- Messages
- 3,921
- Country
Hi,
Since there are two places to work in my real life. Each place has computer that I put my project in to decrease my boredom life. Each project is parallel running slowly. I did set up ZBAA project about a month ago. I'd like to post this to make a time stamp how long the project gonna be. My WMKK project is almost done. It should be finished in about a month.
I think a lot of people are making this airport. But I just feel like making Terminal 3 in Beijing International Airport. The shape of the architecture is challenging. I will do this airport no mater what happens. It will takes years. During of the developing process, someone else might launch this airport already. Never mine, I just feel happy to do. Let me be an option to choose or, may be a big freeware, I don't know yet. Time will tell.
Please take a look, it is just in Gmax only. Everything is made from scratch, both models and textures.
Since there are two places to work in my real life. Each place has computer that I put my project in to decrease my boredom life. Each project is parallel running slowly. I did set up ZBAA project about a month ago. I'd like to post this to make a time stamp how long the project gonna be. My WMKK project is almost done. It should be finished in about a month.
I think a lot of people are making this airport. But I just feel like making Terminal 3 in Beijing International Airport. The shape of the architecture is challenging. I will do this airport no mater what happens. It will takes years. During of the developing process, someone else might launch this airport already. Never mine, I just feel happy to do. Let me be an option to choose or, may be a big freeware, I don't know yet. Time will tell.
Please take a look, it is just in Gmax only. Everything is made from scratch, both models and textures.
Last edited: