Reverse Polish Notation: Difference between revisions
From FSDeveloper Wiki
Jump to navigationJump to search
(Add an example section) |
m (Replaced Applicable-FSVersion for MSFS with MSFS2020, added MSFS2024) |
||
| (3 intermediate revisions by one other user not shown) | |||
| Line 1: | Line 1: | ||
{{Infobox-Applicable-FSVersion | {{Infobox-Applicable-FSVersion | ||
| | | MSFS2024 = unknown | ||
| MSFS2020 = true | |||
| FSXI = false | | FSXI = false | ||
| P3D5 = false | | P3D5 = false | ||
| Line 21: | Line 22: | ||
'''The [https://docs.flightsimulator.com/html/index.htm#t=Additional_Information%2FReverse_Polish_Notation.htm documentation] on RPN thoroughly explains how it works. | '''The [https://docs.flightsimulator.com/html/index.htm#t=Additional_Information%2FReverse_Polish_Notation.htm documentation] on RPN thoroughly explains how it works. | ||
''' | ''' | ||
== Mission Script Elements that use RPN == | |||
{|class='wikitable' | |||
|[[MSFS_Mission_Script_-_Calculator|Calculator]] | |||
|- | |||
|[[Property_Trigger|PropertyTrigger]] | |||
|- | |||
|[[Execute_RPN_Action|ExecuteRPNAction]] | |||
|} | |||
== Examples == | == Examples == | ||
| Line 27: | Line 37: | ||
1800 (>X:VariableToChange) | 1800 (>X:VariableToChange) | ||
This example changes the variable <code>VariableToChange</code> to 1800. | This example changes the variable <code>VariableToChange</code> to 1800. | ||
=== If, Else construction === | |||
(condition) if{this} els{that} | |||
If the condition is true, the formula will become <code>{this}</code>, otherwise it will become <code>{that}</code>. | |||
Latest revision as of 12:21, 25 May 2024
| Applicable |
|---|
| MSFS2024 |
| MSFS2020 |
| MS Flight |
| LM P3D5 |
| LM P3D4 |
| LM P3D3 |
| LM P3D2 |
| LM P3D |
| FS World |
| FSXSE |
| FSXA |
| FSX |
| FS2004 |
| FS2002 |
| XP11 |
| XP10 |
| XP9 |
Reverse Polish Notation, or RPN, is a way to write down formulas. It is used in MSFS for gauges, model behaviors, and in mission scripts for PropertyTriggers, ProximityTriggers, and Calculators.
The documentation on RPN thoroughly explains how it works.
Mission Script Elements that use RPN
| Calculator |
| PropertyTrigger |
| ExecuteRPNAction |
Examples
Changing a variable
You can change a variable with RPN code in a Calculator or Execute RPN Action.
1800 (>X:VariableToChange)
This example changes the variable VariableToChange to 1800.
If, Else construction
(condition) if{this} els{that}
If the condition is true, the formula will become {this}, otherwise it will become {that}.